Differentiable Reliability, live
Back to ResearchRace two ways to compute capacity accreditation, how much each resource counts toward reliability, for eight resources of the RTS-GMLC test system. Infinitesimal perturbation analysis (IPA) needs one Monte Carlo simulation for all of them; the perturbation method re-runs the simulation for each resource.
Tab was hidden mid-run; times may be skewed.
Accreditation factor share of nameplate that counts toward adequacy
About these numbers baseline reliability, the paper’s timings, sources, caveats
Baseline reliability
| Measure | This run | Paper |
|---|---|---|
| Expected unserved energy | — | 394 MWh/yr |
| Loss-of-load hours | — | 2.1 h/yr |
The paper ran one million simulated years.
In the paper, Table I
| Resource | IPA | Perturbation |
|---|---|---|
| Gas combined cycle | 0.84 | 0.84 |
| Gas turbine | 0.96 | 0.96 |
| Coal | 0.91 | 0.91 |
| Nuclear | 0.49 | 0.48 |
| Oil turbine | 0.89 | 0.89 |
| Hydro | 0.75 | 0.76 |
| Wind | 0.08 | 0.09 |
| Solar | 0.09 | 0.09 |
In the paper, Table II
| Method | Seconds per generator | Runs per resource | Runs for the system |
|---|---|---|---|
| ELCC (Bisection) | 452.8 | ≈ 7 | 1 + NgNp |
| ELCC (Secant) | 307.5 | ≈ 3.7 | 1 + NgNp |
| MRI (Perturb) | 65.7 | 1 | 1 + NgNp |
| MRI (IPA) | 0.4* | 0 | 1 |
* One IPA run divided by Ng = 153 generators, since one run gives all their gradients. The scripts also run the perfect resource, so this page counts Ng + 2 = 155.
Caveats
- The random numbers differ from PRAS’s, so the factors agree with the paper’s statistically, not digit for digit; ± is one standard error.
- Wind: both methods settle near 0.08 here, as in Table I’s IPA column and the paper’s Table VII (0.080). Table I’s perturbation column prints 0.09.
- Hydro: the perturbation lane reads about 0.005 high. That is the 10 MW step; a 1 MW step closes the gap.
- Solar: IPA counts solar only in shortfall hours, while the finite difference also credits solar that charged the battery beforehand, so it reads about 0.007 higher.
- Both lanes run at once on this device, one thread each, with identical seeds and samples, so the speedup is about K + 2 by construction for K resources.
- The battery and the 200 MW concentrating-solar plant are simulated but not accredited; storage has no IPA factor in the paper either.
Sources
Q. Zhang, F. Zhao, G. Stephen, C. Singh, L. Xie, ‘A Gradient-Based Capacity Accreditation Framework in Resource Adequacy: Formulation, Computation, and Practical Implications’, arXiv:2601.22087, Tables I and II. Model: RTS-GMLC as packaged for NREL’s PRAS, one copperplate region, prepared as the paper’s scripts prepare it; one sample is one simulated year of 8,784 hours.